Status
In Production
Location
approx. 12-25 km from the coast of Guérande
Wind turbines
6 MW turbines
Number of turbines
80 Siemens SWT-7.0-154 turbines
Annual production
480 MW / about 630,000 households
Owner & Developer
EMF (EDF 50%)
Sif Client
Eiffage Métal SAS
Foundation
monopiles
Water depth
approx. 12-25 meter
Installed
2022
Weight
48,918 tons
Diameter
5.9/7 meter
Length
64.2 meter
Foundation
transition pieces
Weight
24,500 tons
Diameter
6/6.98 meter
Length
28.6 meter
Resource Downloader aspx 6 ret

St Nazaire

The Saint Nazaire wind farm is an offshore wind project being developed in the Loire-Atlantique region in France. It is owned by Eolien Maritime France (EMF), a joint venture formed in May 2016 between EDF Renewables (50%) and its subsidiary Enbridge (50%).

The Saint Nazaire wind farm will be situated on the bench of Guérande, approximately 12 km from the coastline. The offshore wind farm will be equipped with 80 Siemens SWT-7.0-154 7 MW turbines. The wind turbines will be installed at depths between 12 and 25 metres, on monopile foundations with a mast, approximately 12 to 20 km offshore.

References

Windpark Maasvlakte 2

2021
More

Hollandse Kust Noord

2020
More

Dogger Bank C

2021
More

Hollandse Kust Zuid

2020
More

Dogger Bank B

2020
More

Dogger Bank A

2020
More

Borssele 1-2

2020
More

St. Brieuc

2020
More

Johan Sverdrup P2

2020
More

Borssele Beta

2020
More

References

Windpark Maasvlakte 2

2021
More

Hollandse Kust Noord

2020
More

Dogger Bank C

2021
More

Hollandse Kust Zuid

2020
More